US · guidance
CMS SOM App. H, Tag V332
ANSI/AAMI RD47:2002/A1:2003 Requirements as Adopted by Reference 42 CFR §
494.50(b)(1)
11.2 Rinsing/cleaning
11.2.1
When pre-cleaning is done, it is part of the reprocessing procedures.
All applicable requirements for design and maintenance of equipment included in this
document should be adhered to for pre-cleaning of equipment. The maximum pressures for
the dialyzer, or other limits set by the manufacturer, should be adhered to.
Interpretive Guidance § 494.50(b)(1)
ANSI/AAMI RD47:2002/A1:2003
11.2.1 Rinsing/cleaning
Many facilities pre-clean dialyzers. This process is typically accomplished with an apparatus
developed by users and is intended to remove gross deposits of blood and products before
rinsing and cleaning with a reprocessing machine or device.
AAMI Rationale for the Development and Provisions of this Recommended Practice
A.11.2.1 Rinsing/cleaning
Aqueous liquids rather than gases such as air are preferred for rinsing and cleaning.
Additional Guidance:
Page 139 of 420
Maximum pressures allowed during reprocessing will be defined in the dialyzer manufacturer’s
directions for use (DFU). Use of higher pressures may cause breaks in the dialyzer fibers and
potential blood leaks. A pressure gauge must be in place to monitor the pressure of the treated
water source used for rinsing the used dialyzers, and the maximum limits of the pressure to be
used must be defined and known to the operator.
Use V315 if there is no pressure gauge in the water line at the rinse sink; use this tag (V332) if
the manufacturer’s specified pressures are exceeded.
History
Rev.
Provenance
- Source
- cms.gov
- Retrieved
- 2026-07-22
- Edition
- som-2026-07-22
- Content hash
efecf4224fd131e20a5006eff51d248dd8b38cc835c9eb21d1f0fbda645fc9fc
The link goes to the issuing authority’s own document — the one we read to produce this record. Where a source publishes whole titles rather than sections, your browser may need a moment to jump to the provision.
Unofficial copy of government-published law, reproduced from official sources with full provenance. Not an official publication; verify against official sources before relying on it in a filing. Records in the 'guidance' corpus, and only that corpus, are sub-regulatory (interpretive guidelines, survey procedures) and are not binding law. Validity bounds follow each jurisdiction's declared temporalBasis.