Bindinglaw

US · guidance

BOP Program Statement 8281.03 § 4

BLUEPRINTS/SPECIFICATIONS. The Product/Process Folder will contain a copy of all

activein force · 2026-02-26 – presentact-effective-date

drawings and specifications for the item. Only drawings that apply to the applicable product

structure level need to be included in the folder. For example, a routing pertaining to assembly

only needs to include assembly-level drawings.

A drawing or specification list may be included in place of large or electronically maintained

drawings or specifications provided they are readily accessible and their location is referenced in

the folder.

History

PS 8281.03 dated 2026-02-26

Provenance

Source
bop.gov
Retrieved
2026-09-20
Edition
bop-ps-2026-09-20
Content hash
7d3058ec37558c19dea528628883df6889dfe425b4834288682cca7964a2185e
View the official source →

The link goes to the issuing authority’s own document — the one we read to produce this record. Where a source publishes whole titles rather than sections, your browser may need a moment to jump to the provision.

Unofficial copy of government-published law, reproduced from official sources with full provenance. Not an official publication; verify against official sources before relying on it in a filing. Records in the 'guidance' corpus, and only that corpus, are sub-regulatory (interpretive guidelines, survey procedures) and are not binding law. Validity bounds follow each jurisdiction's declared temporalBasis.

Coverage · API docs

Bindinglaw

Point-in-time US law with the receipt attached. Source URL, retrieval time, content hash, and validity dates on every answer.

curl api.binding.law/v1/law/coverage

© 2026 binding.law · a Jubal, Inc. productAttorneys and firms never pay. Ever.