US · guidance
BOP Program Statement 4200.13 § 8
PREVENTIVE MAINTENANCE AND INSPECTIONS
a. Responsibility
The Bureau has a substantial investment in the physical plant of its institutions. It is the Facilities
Department’s responsibility to maintain these physical plants to ensure maximum life cycle use
and to ensure the reliability of the various systems and components.
The Facilities Manager must develop a Maintenance, Inspection, and Testing Program. This
4200.13 5/7/2026 PROPERTY OF US GOVERNMENT 9
program must comply with all applicable Bureau policies, National Fire Protection Association
(NFPA) standards, manufacturer recommendations, industry standards, and applicable federal,
state, or local codes and regulations.
b. Definitions
1) Asset or Maintenance Worthy Item (MWI) is a physical asset, system, or component
of a building that requires regular maintenance, inspection, or repair to maintain operational
efficiency, safety, and functional integrity throughout its intended lifespan. Additionally, an
asset or MWI is more cost effective to maintain than to replace. All assets must have
permanently affixed identification.
2) Preventive Maintenance (PM) Work Orders are utilized to establish the applicable
procedure and frequency to maintain a specific piece of equipment or asset group.
3) Planned Event (PE) Work Orders are utilized to establish the applicable procedure and
frequency to maintain a system not identified as an asset and/or conduct an inspection or test.
A PE can also be created as a reminder to complete a particular procedure.
c. Preventive Maintenance, Inspections, And Test Procedures
Each institution must use CMMS to schedule and track preventive maintenance, inspections, and
test activities in accordance with Facilities Management Operational Standards posted on the
FMB page of the Bureau’s intranet site.
The responsible department’s cost center manager should purchase materials necessary for repairs
incurred on food service and laundry equipment. The Facilities Department will maintain and
purchase materials necessary for repairs incurred on equipment replaced through the B&F
project process unless other arrangements are made and locally agreed to in writing by the
applicable department head.
History
PS 4200.13 dated 2026-05-07
Provenance
- Source
- bop.gov
- Retrieved
- 2026-09-20
- Edition
- bop-ps-2026-09-20
- Content hash
38b29352c9b980b3c4071d0acafd9c72b29142dac6aac3c2eadd630e40873659
The link goes to the issuing authority’s own document — the one we read to produce this record. Where a source publishes whole titles rather than sections, your browser may need a moment to jump to the provision.
Unofficial copy of government-published law, reproduced from official sources with full provenance. Not an official publication; verify against official sources before relying on it in a filing. Records in the 'guidance' corpus, and only that corpus, are sub-regulatory (interpretive guidelines, survey procedures) and are not binding law. Validity bounds follow each jurisdiction's declared temporalBasis.