GENERAL PERMITTING REQUIREMENTS
Where applicable, institutions must obtain institution-wide permits (NPDES, hazardous waste,
air emissions, etc.).
In addition, a single EPA hazardous waste identification number must be obtained for contiguous
facilities, including UNICOR operations, that are small or large quantity generators of hazardous
waste. If required by the state or determined to be preferential, very small quantity generators of
hazardous waste will also obtain EPA hazardous waste identification numbers.
History
PS 1605.01 dated 2026-05-07
Provenance
- Source
- bop.gov
- Retrieved
- 2026-09-20
- Edition
- bop-ps-2026-09-20
- Content hash
cd7ca602901756b84aa3b2fe7b9f2ea7c92a1cefa2ff92bbaa1cbd48fc7593c6
The link goes to the issuing authority’s own document — the one we read to produce this record. Where a source publishes whole titles rather than sections, your browser may need a moment to jump to the provision.
Unofficial copy of government-published law, reproduced from official sources with full provenance. Not an official publication; verify against official sources before relying on it in a filing. Records in the 'guidance' corpus, and only that corpus, are sub-regulatory (interpretive guidelines, survey procedures) and are not binding law. Validity bounds follow each jurisdiction's declared temporalBasis.