ABOVEGROUND STORAGE TANK (AST) MANAGEMENT

activein force · 2026-05-07 – presentact-effective-date

The SA, with assistance from the Facilities Manager, must survey the institution to identify

ASTs, collecting the following information for each:

 Location

 Product stored in the AST

 Storage capacity, shell capacity denoted in gallons

 Description of secondary containment and leak detection equipment

 Maintenance and calibration requirements specified by the manufacturer

 Tank registration and operating permits required by the state

1605.01 5/7/2026 PROPERTY OF US GOVERNMENT 21

Survey results are kept permanently in the Facilities Department and OSHD and updated, as

required.

a. ASTs Not in Use. ASTs no longer in use must be drained, capped, signed, and closed in

accordance with federal, state, and local regulations.

b. AST Training. The SA, with assistance from the respective department head that operates an

AST, must identify state regulatory requirements.

The SA, with the assistance of the Facilities Manager, must develop AST training addressing, at

a minimum:

 Operation and maintenance of equipment to prevent discharges

 Discharge procedure protocols

 Applicable pollution control laws, rules, and regulations

 General facility operations

 Contents of the institution’s SPCC plan, as specified within the SPCC plan

 Location of institution spill response materials

OSHD staff must address state and local AST regulations and SPCC plan requirements within

the training.

c. AST Maintenance and Inspection. The Facilities Manager must input AST maintenance

and inspections requirements, per manufacturer, state, and SPCC requirements, into the

computerized maintenance system and ensure maintenance is performed. The list of required

inspection points must reflect those required in the SPCC plan. Documentation must be

maintained for three years.

Monthly, the SA must ensure an institution-wide AST inspection is conducted. If the facility has

a SPCC plan, inspections are conducted to meet SPCC requirements, using the checklists

included within the plan. The checklists may be entered into the computerized maintenance

system. Uncorrected discrepancies are reported in the monthly safety and environmental report.

All recurring discrepancies must be presented at the Institution Environmental Management

Committee meeting for corrective and preventative action.

Annually, the SA must review the institution AST program using the mandatory AST Checklist,

found on the Environmental Compliance page of the Bureau’s intranet site. Documentation must

be kept by the OSHD for at least four years.

History

PS 1605.01 dated 2026-05-07

Provenance

Source
bop.gov
Retrieved
2026-09-20
Edition
bop-ps-2026-09-20
Content hash
86ae9351b68c03b1a244f7c75f910a4887aed8e52578a1a427f5ba3b65ca05c1
View the official source →

The link goes to the issuing authority’s own document — the one we read to produce this record. Where a source publishes whole titles rather than sections, your browser may need a moment to jump to the provision.

Unofficial copy of government-published law, reproduced from official sources with full provenance. Not an official publication; verify against official sources before relying on it in a filing. Records in the 'guidance' corpus, and only that corpus, are sub-regulatory (interpretive guidelines, survey procedures) and are not binding law. Validity bounds follow each jurisdiction's declared temporalBasis.

Coverage · API docs

Bindinglaw

Point-in-time US law with the receipt attached. Source URL, retrieval time, content hash, and validity dates on every answer.

curl api.binding.law/v1/law/coverage

© 2026 binding.law · a Jubal, Inc. productAttorneys and firms never pay. Ever.