Bindinglaw

US · guidance

CMS Pub. 100-04, ch. 20, § 100.2.3.1

Scheduling and Documenting Recertifications of Medical

activein force · 2026-08-25 – presentas-observed

Necessity for Oxygen

(Rev. 1, 10-01-03)

Recertification scheduling and documentation requirements depend on the date when

home oxygen therapy began. DME MACs request the following information on all

recertifications:

• Date and results of the most recent arterial blood gas or oximetry tests prior to the

recertification date;

• Name of the provider conducting the most recent arterial blood gas or oximetry

tests performed prior to the recertification date and the conditions under which

this test were conducted; and

• Estimated length of need for oxygen (Section B on the Form CMS-484).

DME MAC establish the schedule for recertifying the need for oxygen for patients

beginning home oxygen therapy in accordance with the requirements below:

1. Recertifications

Group I: Recertification requirements are to be determined by the DME MAC.

Group II: If oxygen test results on the initial certification were in Group II, according to

§1834(a)(5) of the Act, recertification of all oxygen patients must be performed within 90

days after initial certification for all patients who begin coverage after January 1, 1991,

with an arterial blood gas result at or above a partial pressure of 55 mm Hg or an arterial

oxygen saturation percentage at or above 89. Repeat blood gas study must be performed

between the 61st - 90th day of home oxygen therapy. Retesting is required only if a claim

for oxygen therapy will be filed for the fourth or later months.

If recertification is due, DME MACs do not pay the next month's claim if the test was not

performed during the required time frame. If a qualifying test is not obtained between the

61st and 90th day of home oxygen therapy, but the patient continues to use oxygen and a

test is obtained at a later date, DME MAC instruct suppliers to use the date of the repeat

test as the date of service on a subsequent claim, and if that test meets Group II criteria,

they resume payments from that point of time.

2. New Orders - In the following situations, a new order must be obtained and kept

on file by the supplier, but neither a new CMN nor a repeat blood gas study are

required:

• If the prescribed maximum flow rate changes but remains within one of the

following categories: (a) less than 1 LPM, (b) 1-4 LPM, (c) greater than 4 LPM

• If the physician has initially specified a delivery system, and a change is made

from one type of stationary system to another (i.e., concentrator, liquid,

gaseous).

History

(Rev. 1, 10-01-03)

Provenance

Source
cms.gov
Retrieved
2026-08-25
Edition
iom-2026-08-25
Content hash
4fe8024a222b5b8307c4ef5ac778cf482fb26b6fb16f11aaa6fd843f78de75a0
View the official source →

The link goes to the issuing authority’s own document — the one we read to produce this record. Where a source publishes whole titles rather than sections, your browser may need a moment to jump to the provision.

Unofficial copy of government-published law, reproduced from official sources with full provenance. Not an official publication; verify against official sources before relying on it in a filing. Records in the 'guidance' corpus, and only that corpus, are sub-regulatory (interpretive guidelines, survey procedures) and are not binding law. Validity bounds follow each jurisdiction's declared temporalBasis.

Coverage · API docs

Bindinglaw

Point-in-time US law with the receipt attached. Source URL, retrieval time, content hash, and validity dates on every answer.

curl api.binding.law/v1/law/coverage

© 2026 binding.law · a Jubal, Inc. productAttorneys and firms never pay. Ever.